General Overview
This facility generates Scrap Metal, which can be manufactured to Steel.
Station Manufacturing Process
The following stations requires this product during the manufacturing process:
Steel Factory
Construction
Cost to produce: 9,750,000 credits.
Production
This factory produces the following resources per cycle:
Name | Quantity | Volume | Avg. Price | Illegal? | Dangerous? |
---|---|---|---|---|---|
Scrap Metal | 60 | 3 | 25 | No | No |
Profitability
This station's profitability is an average of 1500 credits per cycle.
List of all Goods