Avorion Wiki
Register
Advertisement

Noble Metal Mine[ | ]

General Overview[ | ]

Noble metal mines are used to gather a variety of metals. Noble metal mines can only be constructed from a claimed asteroid. There are five different types of noble metal mine. Metals are used in a large variety of applications throughout the galaxy.

Station Manufacturing Process[ | ]

Metals produced at these mines are used in the following applications:

Gold

Computer Component Factory, Conductor Factory, Fusion Core Factory, Jewelry Manufacturer, Processor Factory, Semi Conductor Manufacturer, Solar Cell Factory, Wire Manufacturer

Silver

Metal Plate Factory, Tools Factory, Transformator Factory

Platinum

Computer Component Factory, Conductor Factory, Energy Tube Factory, Jewelry Manufacturer, Processor Factory, Solar Cell Factory, Tools Factory

Construction[ | ]

Noble Metal Mine Type Cost per station
Type 1 9,075,000 credits
Type 2 7,725,000 credits
Type 3 7,050,000 credits
Type 4 7,050,000 credits
Type 5 7,050,000 credits


Production[ | ]

Please note 3 of the mines currently perform the same function. Noble metal mines produce the following resources per cycle:

Type 1[ | ]

Name Quantity Volume Avg. Price Illegal? Dangerous?
Gold 1 0.5 600 No No
Platinum 1 0.5 750 No No

Type 2[ | ]

Name Quantity Volume Avg. Price Illegal? Dangerous?
Silver 1 0.5 300 No No
Platinum 1 0.5 750 No No

Type 3[ | ]

Name Quantity Volume Avg. Price Illegal? Dangerous?
Silver 1 0.5 300 No No
Gold 1 0.5 600 No No

Type 4[ | ]

Name Quantity Volume Avg. Price Illegal? Dangerous?
Silver 1 0.5 300 No No
Gold 1 0.5 600 No No

Type 5[ | ]

Name Quantity Volume Avg. Price Illegal? Dangerous?
Silver 1 0.5 300 No No
Gold 1 0.5 600 No No

All five varieties of Noble Metals Mines have default cycle times at the minimum of 15 seconds. Adding assembly blocks provides no additional benefit.

Used Goods[ | ]

The following goods are used by the mine and can be sold to it:

  • Acid, Antigrav Units, Drills, Fusion Generators, Medical Supplies, Mining Robots, Solvent

Profitability[ | ]

Mine Type Profitability Per Cycle
Type 1 1350 credits
Type 2 1050 credits
Type 3 900 Credits
Type 4 900 Credits
Type 5 900 Credits

List of all Goods

Advertisement